Ben Carson - project manager

 

 

Since their last trip south in December, the group has translated the clay model which was unveiled to admiring gasps in a pre-Christmas preview into detailed drawings of a “voluptuous” and “organic” steel-ribbed structure that will be “wrapped” in 1/8-inch thick sheets of aluminum or brushed stainless steel.

 

David Bryant - design engineer
 
 
 

Phillip Davenport - construction engineer
Earl Lee - construction manager